Building Construction — Sullivan, New Hampshire

WD NH20260020-17405-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Sullivan, New Hampshire (construction type: building) is $44.36/hr base + $36.63/hr fringe = $80.99/hr total package (WD NH20260020-17405-bld, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: NH20260020-17405-bld
Revision: 1
Construction Type: building
State: New Hampshire (NH)
County: Sullivan
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference NH20260020View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $44.36 $36.63 $80.99 Above median +297% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING $21.46 $4.22 $25.68 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.55 $7.14 $30.69 +24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.12 $22.92 $59.04 +98% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $29.89 $10.70 $40.59 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.65 $26.12 $59.77 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.40 $21.43 $46.83 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $19.60 $2.73 $22.33 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.85 $2.61 $23.46 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.52 $3.17 $24.69 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $20.62 $0.00 $20.62 -14% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.76 $26.19 $71.95 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $25.77 $9.23 $35.00 +17% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 26.56 24.03 ROOFER $18.87 $0.00 $18.87 -26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.43 $3.60 $21.03 Above median -25% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sullivan, NH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sullivan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260020-17405-bld →