Building Construction — Rockingham, New Hampshire

WD NH20260022-15430-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Rockingham, New Hampshire (construction type: building) is $44.36/hr base + $36.63/hr fringe = $80.99/hr total package (WD NH20260022-15430-bld, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: NH20260022-15430-bld
Revision: 1
Construction Type: building
State: New Hampshire (NH)
County: Rockingham
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference NH20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $44.36 $36.63 $80.99 Above median +297% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $42.83 $25.29 $68.12 +101% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $43.91 $28.47 $72.38 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK (EXCLUDES DRYWALL HANGING AND DRYWALL FINISHING/TAPING $24.47 $8.55 $33.02 +15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.04 $9.70 $31.74 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $74.17 $38.44 $112.61 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $25.00 $0.00 $25.00 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION $25.00 $0.00 $25.00 Top 10% -16% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.12 $22.92 $59.04 +98% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $26.75 $3.48 $30.23 +15% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.65 $26.12 $59.77 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.40 $21.43 $46.83 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $16.52 $4.74 $21.26 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.02 $4.25 $28.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.42 $3.83 $31.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.25 $2.13 $24.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.56 $3.28 $26.84 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $18.10 $1.58 $19.68 -17% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.99 $3.28 $26.27 +10% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.76 $26.19 $71.95 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $26.72 $5.56 $32.28 +8% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 24.88 5.46 ROOFER $19.22 $0.00 $19.22 -25% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $31.29 $9.78 $41.07 +38% vs market $0.00 $0.00 $0.00 $0.00
WATERPROOFER $26.69 $0.00 $26.69 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rockingham, NH — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.