Highway Construction — Merrimack, New Hampshire

WD NH20260037-17902-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Merrimack, New Hampshire (construction type: highway) is $21.12/hr base + $1.10/hr fringe = $22.22/hr total package (WD NH20260037-17902-hwy, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: NH20260037-17902-hwy
Revision: 1
Construction Type: highway
State: New Hampshire (NH)
County: Merrimack
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference NH20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $21.12 $1.10 $22.22 -23% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $27.72 $2.24 $29.96 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.50 $0.00 $18.50 -25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.51 $2.32 $24.83 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $17.52 $3.17 $20.69 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.98 $4.81 $22.79 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.36 $0.00 $20.36 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.68 $4.52 $29.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.77 $7.02 $30.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.27 $2.89 $22.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.35 $0.00 $24.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.12 $6.59 $34.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $28.55 $0.53 $29.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $20.39 $2.88 $23.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.73 $6.96 $31.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $25.02 $3.38 $28.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $22.25 $5.67 $27.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $40.22 $3.97 $44.19 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.55 $4.59 $24.14 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $28.38 $11.86 $40.24 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $16.11 $2.21 $18.32 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.42 $2.60 $22.02 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $20.14 $4.27 $24.41 Above median -13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Merrimack, NH — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.