Highway Construction — Carroll, New Hampshire

WD NH20260033-17728-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Carroll, New Hampshire (construction type: highway) is $20.89/hr base + $1.61/hr fringe = $22.50/hr total package (WD NH20260033-17728-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: NH20260033-17728-hwy
Revision: 1
Construction Type: highway
State: New Hampshire (NH)
County: Carroll
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference NH20260033View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $20.89 $1.61 $22.50 -22% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $25.67 $2.39 $28.06 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.50 $0.00 $18.50 -25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.59 $0.90 $22.49 -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $17.18 $3.22 $20.40 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.76 $1.83 $20.59 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.89 $3.10 $21.99 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.90 $4.55 $28.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.64 $0.00 $25.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $16.67 $2.22 $18.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $25.96 $4.50 $30.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.71 $6.16 $33.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.79 $0.53 $28.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.49 $5.57 $28.06 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.80 $6.63 $31.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $24.97 $9.43 $34.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.64 $4.54 $28.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.54 $3.42 $22.96 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $28.88 $12.06 $40.94 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $14.45 $0.00 $14.45 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.30 $4.63 $26.93 Above median -4% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Carroll, NH — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Carroll

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260033-17728-hwy →