Highway Construction — White Pine, Nevada
WD NV20260054-17408-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in White Pine, Nevada (construction type: highway) is $36.64/hr base + $15.45/hr fringe = $52.09/hr total package (WD NV20260054-17408-hwy, Rev. 2).
Scroll down for all 26 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $36.64 | $15.45 | $52.09 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $34.45 | $16.30 | $50.75 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $33.95 | $16.30 | $50.25 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $34.20 | $16.30 | $50.50 Above median +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: JACKHAMMER | $34.20 | $16.30 | $50.50 Above median +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $34.20 | $16.30 | $50.50 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $34.45 | $16.30 | $50.75 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT/CONCRETE LAYDOWN | $60.39 | $30.38 | $90.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $50.47 | $30.38 | $80.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $39.05 | $23.76 | $62.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $44.42 | $19.21 | $63.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $60.39 | $30.38 | $90.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $46.92 | $25.02 | $71.94 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $50.47 | $30.38 | $80.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $50.28 | $30.38 | $80.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $50.28 | $30.38 | $80.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $55.93 | $15.47 | $71.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $63.57 | $36.40 | $99.97 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $40.99 | $26.97 | $67.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $60.39 | $30.38 | $90.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $43.24 | $25.09 | $68.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $32.08 | $16.30 | $48.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $36.70 | $16.30 | $53.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $40.52 | $0.00 | $40.52 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $42.48 | $0.00 | $42.48 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the White Pine, NV — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in White Pine
Compliance Notes
- This wage determination applies to federal contracts for highway construction in White Pine, Nevada.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.