Highway Construction — Washoe, Nevada

WD NV20260059-17488-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Washoe, Nevada (construction type: highway) is $46.50/hr base + $17.92/hr fringe = $64.42/hr total package (WD NV20260059-17488-hwy, Rev. 2).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: NV20260059-17488-hwy
Revision: 2
Construction Type: highway
State: Nevada (NV)
County: Washoe
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference NV20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $46.50 $17.92 $64.42 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $43.06 $13.69 $56.75 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $58.48 $27.62 $86.10 Top 10% +176% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $50.70 $35.15 $85.85 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $50.70 $35.15 $85.85 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $33.95 $16.30 $50.25 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $34.20 $16.30 $50.50 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $34.20 $16.30 $50.50 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $34.92 $0.00 $34.92 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $34.20 $16.30 $50.50 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $49.93 $30.38 $80.31 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $50.47 $30.38 $80.85 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $47.56 $30.38 $77.94 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $65.66 $36.40 $102.06 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $64.52 $36.40 $100.92 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $63.79 $36.40 $100.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $64.02 $36.40 $100.42 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $60.84 $36.40 $97.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADE CHECKER $50.71 $30.38 $81.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $50.71 $30.38 $81.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $50.28 $30.38 $80.66 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $50.28 $30.38 $80.66 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $46.76 $30.38 $77.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $50.71 $30.38 $81.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $60.39 $30.38 $90.77 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $63.90 $36.40 $100.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $49.61 $30.38 $79.99 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $50.37 $0.00 $50.37 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $32.08 $16.30 $48.38 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $36.70 $16.30 $53.00 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $26.77 $0.00 $26.77 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $27.11 $0.00 $27.11 Above median -7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washoe, NV — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washoe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260059-17488-hwy →