Building Construction — Pershing, Nevada

WD NV20260036-17486-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Pershing, Nevada (construction type: building) is $52.36/hr base + $26.62/hr fringe = $78.98/hr total package (WD NV20260036-17486-bld, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: NV20260036-17486-bld
Revision: 1
Construction Type: building
State: Nevada (NV)
County: Pershing
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference NV20260036View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $52.36 $26.62 $78.98 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.56 $13.57 $42.13 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.50 $23.04 $71.54 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC: HVAC DUCT INSTALLATION ONLY $43.01 $21.60 $64.61 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $50.70 $35.15 $85.85 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $33.95 $16.30 $50.25 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( CONCRETE SAW, MASON TENDER- CEMENT/CONCRETE) $34.20 $16.30 $50.50 +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( PIPELAYER) $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.02 $10.71 $55.73 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $37.68 $6.04 $43.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $46.74 $3.97 $50.71 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $46.00 $16.21 $62.21 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $39.43 $15.71 $55.14 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $41.43 $15.71 $57.14 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $29.19 $16.12 $45.31 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $47.51 $29.38 $76.89 Above median +236% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pershing, NV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pershing

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260036-17486-bld →