Building Construction — Nye, Nevada

WD NV20260002-16028-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS/INSULATOR WORKER: MECHANIC ZONE PAY: $0.00 ZONE PAY: $4.00 ZONE PAY: $5.00 ZONE PAY: $7.00 ZONE PAY: $8.00 in Nye, Nevada (construction type: building) is $62.85/hr base + $26.75/hr fringe = $89.60/hr total package (WD NV20260002-16028-bld, Rev. 2).

Scroll down for all 47 trade classifications covered by this determination.

WD Number: NV20260002-16028-bld
Revision: 2
Construction Type: building
State: Nevada (NV)
County: Nye
Effective: May 17, 2026
Trades covered: 47
Official source: SAM.gov reference NV20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER: MECHANIC ZONE PAY: $0.00 ZONE PAY: $4.00 ZONE PAY: $5.00 ZONE PAY: $7.00 ZONE PAY: $8.00 $62.85 $26.75 $89.60 $0.00 $0.00 $0.00 $0.00
BOILERMAKER: BLACKSMITH ZONE PAY ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50 $49.66 $31.50 $81.16 +131% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 $52.44 $18.79 $71.23 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25 $64.37 $28.81 $93.18 +211% vs market $0.00 $0.00 $0.00 $0.00
CAULKER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 $52.79 $20.89 $73.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
CAULKER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 $54.16 $27.84 $82.00 Top 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50 $62.85 $26.75 $89.60 +208% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50 $62.85 $26.75 $89.60 Above median +187% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50 $39.74 $12.42 $52.16 +67% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50 $66.73 $30.01 $96.74 Top 10% +210% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER ZONE PAY- NNSS $5.50 NTTR $5.50 $56.69 $28.62 $85.31 +182% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & $41.13 $27.22 $68.35 +198% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE C $41.39 $27.22 $68.61 +199% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION $41.57 $27.22 $68.79 +199% vs market $0.00 $0.00 $0.00 $0.00
LABORER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE $64.37 $28.81 $93.18 +306% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MINER-TUNNEL HARDROCK ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE $52.14 $24.18 $76.32 +232% vs market $0.00 $0.00 $0.00 $0.00
LABORER, SHAFT, RAISE, STOPE MINER ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE $52.14 $24.18 $76.32 +232% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION, LINEMAN ZONE PAY - NNSS $5.00 LINE CONSTRUCTION, GROUNDMAN ZONE PAY - NNSS $5.00 NTTR $5.00 $47.69 $27.27 $74.96 +30% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION, LINEMAN ZONE PAY - NNSS $5.00 NTTR $5.00 $46.69 $27.27 $73.96 +28% vs market $0.00 $0.00 $0.00 $0.00
MERCURY $7.50 FORWARD AREAS $11.25 PAINTER ZONE PAY- NNSS $5.00 NTTR $5.00 $51.79 $24.18 $75.97 $0.00 $0.00 $0.00 $0.00
MILES $43.86 $28.37 $72.23 Top 10% $0.00 $0.00 $0.00 $0.00
MILES $43.69 $28.37 $72.06 Bottom 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25 $43.27 $29.66 $72.93 +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR; TRACTOR LOADER OPERATOR,; TRACTOR OPERATOR; TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR; TUNN $57.74 $34.00 $91.74 $0.00 $0.00 $0.00 $0.00
PAINTER, FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER ZONE PAY- NNSS $5.00 NTTR $5.00..$ 52.79 20.89 LINE CONSTRUCTION $49.74 $18.79 $68.53 +172% vs market $0.00 $0.00 $0.00 $0.00
PAINTER, SPRAY AND PAPERHANGER SIGN ZONE PAY- NNSS $5.00 NTTR $5.00 $46.44 $27.27 $73.71 +193% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING INERT GAS WELDER ZONE PAY: MERCURY $7.50 FORWARD AREAS $11.25 NTTR $11.25 $52.40 $24.18 $76.58 +165% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50 $55.06 $37.26 $92.32 Top 10% +286% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50 $42.03 $28.05 $70.08 Bottom 10% +193% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDLING LEAD BURNER ZONE PAY: MERCURY $7.50 FORWARD AREAS $11.25 NTTR $11.25 $67.19 $19.88 $87.07 +201% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DR $53.79 $34.00 $87.79 +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR; CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COM $54.74 $34.00 $88.74 +154% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE; DERRICKMAN; DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVA $55.03 $34.00 $89.03 Bottom 10% +154% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERA $56.52 $34.00 $90.52 +159% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER, SOIL CEMENT, ASPHALT FINISH; A $57.62 $34.00 $91.62 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN. ZONE PAY ZONE B - $4.50 ZONE C - $4.50 $57.99 $34.00 $91.99 +163% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR. ZONE PAY ZONE B - $4.50 ZONE C - $4.50 $58.92 $34.00 $92.92 +166% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR $58.74 $34.00 $92.74 +165% vs market $0.00 $0.00 $0.00 $0.00
REFRIGERATION MECHANIC ZONE PAY: MERCURY $7.50 FORWARD AREAS $11.25 NTTR $11.25 $61.22 $28.70 $89.92 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER ZONE PAY: NNSS $5.50 NTTR $5.50 $62.08 $31.99 $94.07 +311% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER ZONE PAY: NNSS $5.50 PAINTER, TAPER, FLUSHER AND DETAILER ZONE PAY- NNSS $5.00 NTTR $5.00 $62.08 $31.99 $94.07 +311% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 $44.31 $28.96 $73.27 +154% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00.$ 52 $37.07 $14.74 $51.81 +85% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 $69.43 $38.44 $107.87 Top 10% +285% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER. ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES $44.06 $28.37 $72.43 +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 M $44.78 $28.37 $73.15 +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 TIREMAN ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES $44.26 $28.37 $72.63 +148% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Nye, NV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Nye

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260002-16028-bld →