Highway Construction — Douglas, Nevada

WD NV20260047-17481-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Douglas, Nevada (construction type: highway) is $33.85/hr base + $15.69/hr fringe = $49.54/hr total package (WD NV20260047-17481-hwy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: NV20260047-17481-hwy
Revision: 1
Construction Type: highway
State: Nevada (NV)
County: Douglas
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference NV20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $33.85 $15.69 $49.54 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY STRIPING: LABORER $36.70 $16.30 $53.00 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $41.00 $30.93 $71.93 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $33.95 $16.30 $50.25 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $34.20 $16.30 $50.50 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $34.20 $16.30 $50.50 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $34.20 $16.30 $50.50 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $50.47 $30.38 $80.85 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.49 $20.24 $60.73 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $60.39 $30.38 $90.77 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $46.92 $25.02 $71.94 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $50.47 $30.38 $80.85 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $50.28 $30.38 $80.66 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $44.14 $17.38 $61.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $46.76 $30.38 $77.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $40.81 $25.68 $66.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $60.39 $30.38 $90.77 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $32.08 $16.30 $48.38 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $36.70 $16.30 $53.00 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $33.17 $0.00 $33.17 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Douglas, NV — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Douglas

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260047-17481-hwy →