Heavy Construction — Washington, Nebraska

WD NE20260054-16019-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Washington, Nebraska (construction type: heavy) is $18.72/hr base + $4.72/hr fringe = $23.44/hr total package (WD NE20260054-16019-hvy, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: NE20260054-16019-hvy
Revision: 1
Construction Type: heavy
State: Nebraska (NE)
County: Washington
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference NE20260054View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $18.72 $4.72 $23.44 +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, E $35.00 $18.88 $53.88 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.30 $18.91 $54.21 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.60 $18.94 $54.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDER $36.00 $18.99 $54.99 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $16.88 $4.85 $21.73 Above median $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.31 $4.03 $21.34 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.14 $3.50 $20.64 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $22.92 $5.98 $28.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.19 $3.72 $21.91 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $13.60 $2.59 $16.19 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.49 $7.40 $28.89 Above median +4% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, NE — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.