Heavy Construction — Valley, Nebraska

WD NE20260047-15970-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Valley, Nebraska (construction type: heavy) is $22.02/hr base + $2.68/hr fringe = $24.70/hr total package (WD NE20260047-15970-hvy, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: NE20260047-15970-hvy
Revision: 1
Construction Type: heavy
State: Nebraska (NE)
County: Valley
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference NE20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $22.02 $2.68 $24.70 +4% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.41 $2.70 $21.11 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, E $35.00 $18.88 $53.88 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.30 $18.91 $54.21 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.60 $18.94 $54.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDER $36.00 $18.99 $54.99 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.82 $0.00 $13.82 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.96 $2.61 $22.57 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.47 $4.07 $23.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.95 $3.04 $18.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.54 $1.19 $16.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.89 $2.06 $16.95 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Valley, NE — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Valley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260047-15970-hvy →