Heavy Construction — Thomas, Nebraska

WD NE20260048-15969-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Thomas, Nebraska (construction type: heavy) is $23.58/hr base + $2.48/hr fringe = $26.06/hr total package (WD NE20260048-15969-hvy, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: NE20260048-15969-hvy
Revision: 1
Construction Type: heavy
State: Nebraska (NE)
County: Thomas
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference NE20260048View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $23.58 $2.48 $26.06 +9% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.26 $3.39 $22.65 -2% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, E $35.00 $18.88 $53.88 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.30 $18.91 $54.21 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.60 $18.94 $54.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDER $36.00 $18.99 $54.99 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.82 $2.79 $19.61 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.11 $1.34 $18.45 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.74 $2.32 $22.06 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.00 $4.73 $29.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.95 $3.04 $18.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.68 $0.92 $16.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.89 $2.06 $16.95 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Thomas, NE — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.