Building Construction — Thayer, Nebraska

WD NE20260081-15968-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Thayer, Nebraska (construction type: building) is $34.80/hr base + $19.94/hr fringe = $54.74/hr total package (WD NE20260081-15968-bld, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: NE20260081-15968-bld
Revision: 1
Construction Type: building
State: Nebraska (NE)
County: Thayer
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference NE20260081View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $34.80 $19.94 $54.74 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $16.10 $1.46 $17.56 -26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.54 $1.41 $18.95 -18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.00 $18.88 $53.88 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.30 $18.91 $54.21 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.60 $18.94 $54.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN $36.00 $18.99 $54.99 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID $55.88 $38.44 $94.32 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.96 $4.50 $27.46 -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.00 $13.48 $37.48 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.54 $3.63 $18.17 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.82 $2.22 $24.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.58 $0.94 $17.52 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.25 $21.10 $67.35 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES HVAC PIPE INSTALLATION $44.26 $16.90 $61.16 Bottom 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES HVAC PIPE INSTALLATION $46.25 $21.10 $67.35 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.52 $0.65 $15.17 -31% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION $36.73 $18.09 $54.82 +95% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION $39.65 $19.87 $59.52 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP, LOWBOY AND TANDEM $14.56 $1.68 $16.24 Top 10% -42% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Thayer, NE — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.