Highway Construction — Sioux, Nebraska

WD NE20260030-17082-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Sioux, Nebraska (construction type: highway) is $16.39/hr base + $0.00/hr fringe = $16.39/hr total package (WD NE20260030-17082-hwy, Rev. 1).

Scroll down for all 74 trade classifications covered by this determination.

WD Number: NE20260030-17082-hwy
Revision: 1
Construction Type: highway
State: Nebraska (NE)
County: Sioux
Effective: May 17, 2026
Trades covered: 74
Official source: SAM.gov reference NE20260030View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $16.39 $0.00 $16.39 -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.66 $0.00 $13.66 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.84 $0.00 $19.84 -31% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $15.10 $0.00 $15.10 Above median $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.87 $0.00 $14.87 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $12.60 $0.00 $12.60 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $11.83 $0.00 $11.83 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $11.20 $0.00 $11.20 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.93 $0.00 $17.93 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.52 $0.00 $9.52 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.74 $0.00 $9.74 -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.45 $0.00 $10.45 Above median -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.44 $0.00 $10.44 Above median -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.68 $0.00 $9.68 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.18 $0.00 $10.18 -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.96 $0.00 $9.96 -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.67 $0.00 $11.67 Above median -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.21 $0.00 $11.21 Above median -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.19 $0.00 $10.19 -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.01 $0.00 $10.01 -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.23 $0.00 $10.23 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $8.85 $0.00 $8.85 -61% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $10.39 $0.00 $10.39 Top 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $10.04 $0.00 $10.04 Above median -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.00 $0.00 $9.00 -60% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.30 $0.00 $9.30 -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.75 $0.00 $9.75 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.81 $0.00 $9.81 Above median -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.50 $0.00 $9.50 -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $8.30 $0.00 $8.30 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-FLAGGER & CONE/BARREL SETTER $9.66 $0.00 $9.66 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.30 $0.00 $8.30 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.02 $0.00 $10.02 -55% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $11.17 $0.00 $11.17 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PLANT $14.07 $0.00 $14.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $14.00 $0.00 $14.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.04 $0.00 $14.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.92 $0.00 $10.92 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.16 $0.00 $14.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $10.05 $0.00 $10.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $12.88 $0.00 $12.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $20.39 $0.00 $20.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.66 $0.00 $19.66 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.83 $0.00 $13.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.55 $0.00 $12.55 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.17 $0.00 $13.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $15.46 $0.00 $15.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $12.80 $0.00 $12.80 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $12.50 $0.00 $12.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $12.68 $0.00 $12.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.20 $0.00 $12.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.29 $0.00 $13.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.18 $2.61 $15.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.68 $0.00 $12.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.67 $0.00 $12.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.57 $0.00 $13.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $11.00 $0.00 $11.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $12.35 $0.00 $12.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $13.38 $0.00 $13.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.64 $0.00 $12.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $32.18 $19.75 $51.93 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.00 $0.00 $14.00 -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.11 $0.00 $11.11 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $10.66 $0.00 $10.66 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $12.17 $0.00 $12.17 -56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $11.57 $0.00 $11.57 -58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.36 $0.00 $14.36 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $13.25 $0.00 $13.25 Above median -52% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.37 $0.00 $12.37 -56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.11 $0.00 $12.11 -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK.$ 12.39 0.00 TRUCK DRIVER: SEMI-TRAILER TRUCK..$ 13.31 0.00 TRUCK DRIVER: SEMI-TRAILER TRUCK $11.25 $0.00 $11.25 Top 10% -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.78 $4.97 $23.75 Above median -15% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sioux, NE — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.