Building Construction — Saunders, Nebraska

WD NE20260060-16016-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Saunders, Nebraska (construction type: building) is $24.44/hr base + $0.00/hr fringe = $24.44/hr total package (WD NE20260060-16016-bld, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: NE20260060-16016-bld
Revision: 1
Construction Type: building
State: Nebraska (NE)
County: Saunders
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference NE20260060View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $24.44 $0.00 $24.44 -15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.42 $18.66 $52.08 +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.42 $1.79 $20.21 -15% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.86 $2.06 $17.92 -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $15.03 $2.06 $17.09 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $22.30 $61.30 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.00 $13.48 $37.48 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.06 $0.00 $12.06 -46% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.68 $4.93 $25.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.72 $2.10 $23.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $36.44 $18.69 $55.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $31.06 $18.69 $49.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.27 $4.00 $23.27 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.26 $0.00 $14.26 -34% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.25 $21.10 $67.35 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $23.48 $6.86 $30.34 +0% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.57 $0.77 $14.34 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.65 $19.87 $59.52 +111% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $21.89 $6.30 $28.19 +0% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $14.09 $2.49 $16.58 Above median -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Saunders, NE — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Saunders

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260060-16016-bld →