Building Construction — Sarpy, Nebraska

WD NE20260059-16015-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Sarpy, Nebraska (construction type: building) is $34.80/hr base + $19.94/hr fringe = $54.74/hr total package (WD NE20260059-16015-bld, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: NE20260059-16015-bld
Revision: 1
Construction Type: building
State: Nebraska (NE)
County: Sarpy
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference NE20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $34.80 $19.94 $54.74 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.42 $18.66 $52.08 +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.35 $4.29 $23.64 -1% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $17.44 $0.00 $17.44 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.05 $4.34 $23.39 +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.66 $5.74 $26.40 -9% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID $55.88 $38.44 $94.32 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $17.86 $1.70 $19.56 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $22.30 $61.30 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.00 $13.48 $37.48 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.41 $5.20 $20.61 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.20 $5.47 $26.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.02 $0.91 $23.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $36.44 $18.69 $55.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $31.06 $18.69 $49.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.01 $5.68 $24.69 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.26 $0.00 $14.26 -34% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.25 $21.10 $67.35 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $44.26 $16.90 $61.16 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.57 $0.77 $14.34 -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.65 $19.87 $59.52 +111% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.79 $28.35 $72.14 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.34 $3.22 $18.56 Above median -33% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sarpy, NE — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sarpy

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260059-16015-bld →