Highway Construction — Polk, Nebraska

WD NE20260032-15962-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Polk, Nebraska (construction type: highway) is $16.39/hr base + $0.00/hr fringe = $16.39/hr total package (WD NE20260032-15962-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: NE20260032-15962-hwy
Revision: 1
Construction Type: highway
State: Nebraska (NE)
County: Polk
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference NE20260032View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $16.39 $0.00 $16.39 -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.37 $0.00 $16.37 -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.07 $0.00 $20.07 -30% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $11.18 $0.00 $11.18 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.93 $0.00 $17.93 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.12 $0.00 $12.12 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.76 $0.00 $11.76 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.30 $0.00 $8.30 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.75 $0.00 $9.75 -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER $9.00 $0.00 $9.00 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $12.74 $0.00 $12.74 -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PLANT $14.09 $0.00 $14.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $13.58 $0.00 $13.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $11.41 $0.00 $11.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.01 $0.00 $16.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $10.05 $0.00 $10.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $16.17 $0.00 $16.17 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $14.37 $0.00 $14.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.77 $0.00 $15.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.63 $0.00 $16.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $14.64 $0.00 $14.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.90 $0.00 $17.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.02 $0.00 $13.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.23 $0.00 $15.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $12.35 $0.00 $12.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.45 $0.00 $12.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $32.18 $19.75 $51.93 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $14.20 $0.00 $14.20 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $13.97 $0.00 $13.97 Above median -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $11.97 $0.00 $11.97 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $13.25 $0.00 $13.25 Above median -52% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $14.20 $0.00 $14.20 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.47 $0.00 $13.47 -52% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Polk, NE — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.