Heavy Construction — Pierce, Nebraska

WD NE20260046-16013-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Pierce, Nebraska (construction type: heavy) is $18.75/hr base + $3.25/hr fringe = $22.00/hr total package (WD NE20260046-16013-hvy, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: NE20260046-16013-hvy
Revision: 1
Construction Type: heavy
State: Nebraska (NE)
County: Pierce
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference NE20260046View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $18.75 $3.25 $22.00 -5% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.68 $19.70 $60.38 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS, E $35.00 $18.88 $53.88 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.30 $18.91 $54.21 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDERS $35.60 $18.94 $54.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN FOOTNOTE: WORK ON SCAFFOLDS, HANGING SCAFFOLDS, BOATSWAINS CHAIRS OR LADDER $36.00 $18.99 $54.99 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.69 $1.31 $13.00 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.23 $0.39 $14.62 -35% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $18.23 $2.31 $20.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.47 $4.07 $23.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.95 $3.04 $18.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.79 $1.09 $17.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.89 $2.06 $16.95 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pierce, NE — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.