Residential Construction — Hall, Nebraska

WD NE20260024-15939-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Hall, Nebraska (construction type: residential) is $10.65/hr base + $0.00/hr fringe = $10.65/hr total package (WD NE20260024-15939-res, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: NE20260024-15939-res
Revision: 1
Construction Type: residential
State: Nebraska (NE)
County: Hall
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference NE20260024View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $10.65 $0.00 $10.65 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.67 $0.00 $7.67 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.92 $0.00 $8.92 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLER $7.25 $0.00 $7.25 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $9.38 $0.00 $9.38 -38% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
LATHER $9.00 $0.00 $9.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $8.50 $0.00 $8.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $7.94 $0.00 $7.94 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $9.50 $0.00 $9.50 Above median -65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.30 $0.00 $7.30 -73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $7.65 $0.00 $7.65 -72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MECHANIC $8.50 $0.00 $8.50 -69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER $7.60 $0.00 $7.60 Above median -72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRACTOR $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.67 $0.00 $7.67 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER/AC MECHANIC $7.25 $0.00 $7.25 -74% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $9.65 $0.00 $9.65 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hall, NE — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hall

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260024-15939-res →