Highway Construction — Douglas, Nebraska

WD NE20260028-16005-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Douglas, Nebraska (construction type: highway) is $23.73/hr base + $8.06/hr fringe = $31.79/hr total package (WD NE20260028-16005-hwy, Rev. 1).

Scroll down for all 78 trade classifications covered by this determination.

WD Number: NE20260028-16005-hwy
Revision: 1
Construction Type: highway
State: Nebraska (NE)
County: Douglas
Effective: May 17, 2026
Trades covered: 78
Official source: SAM.gov reference NE20260028View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $23.73 $8.06 $31.79 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $22.29 $6.80 $29.09 Above median +22% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $25.29 $8.06 $33.35 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $20.38 $7.24 $27.62 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.42 $3.00 $23.42 +1% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.67 $3.00 $22.67 -2% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.76 $3.00 $22.76 -2% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN TRAFFIC SIGNALIZATION GROUNDSMAN $14.23 $5.95 $20.18 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN TRAFFIC SIGNALIZATION GROUNDSMAN $18.50 $9.39 $27.89 -3% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION $25.04 $10.36 $35.40 Bottom 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION $28.60 $11.79 $40.39 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION $28.03 $11.79 $39.82 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $16.78 $6.15 $22.93 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $17.33 $6.43 $23.76 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.82 $6.90 $21.72 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $24.40 $9.20 $33.60 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $23.16 $8.86 $32.02 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $25.11 $9.40 $34.51 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.86 $6.35 $21.21 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.60 $6.35 $22.95 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.60 $6.35 $21.95 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $17.43 $6.55 $23.98 +7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $17.26 $6.55 $23.81 +6% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.44 $0.00 $10.44 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER $14.86 $6.35 $21.21 Top 10% -6% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION $47.07 $22.51 $69.58 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION $26.74 $11.29 $38.03 -11% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $30.45 $22.51 $52.96 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS:, SKID LOADER..$ 14.99 6.75 OPERATING ENGINEERS:, SKID LOADER $17.60 $6.75 $24.35 -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT GRINDER $26.00 $10.32 $36.32 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT GRINDER $19.91 $3.77 $23.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $20.25 $0.00 $20.25 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $22.32 $6.75 $29.07 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $19.93 $6.60 $26.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR,..$ 20.93 7.10 OPERATOR: BACKHOE/EXCAVATOR $21.25 $6.60 $27.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $13.21 $0.00 $13.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.27 $6.65 $26.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.21 $6.60 $26.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.21 $6.75 $26.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.27 $6.67 $26.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $18.66 $6.92 $25.58 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $18.66 $6.75 $25.41 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.28 $6.75 $31.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.25 $6.60 $29.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.67 $6.75 $31.42 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.96 $6.60 $29.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.99 $6.75 $27.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.35 $6.75 $27.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $21.17 $6.75 $27.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.21 $6.60 $26.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROHAMMER $17.03 $0.00 $17.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $20.21 $6.60 $26.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $20.21 $6.75 $26.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $23.54 $6.75 $30.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $23.03 $6.75 $29.78 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $26.35 $6.75 $33.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $20.93 $6.75 $27.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $17.02 $6.75 $23.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.93 $6.75 $27.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $26.51 $19.75 $46.26 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.66 $6.75 $25.41 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $20.93 $7.10 $28.03 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.57 $6.75 $23.32 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $17.34 $6.75 $24.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $13.99 $6.60 $20.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRIMMER $22.52 $6.75 $29.27 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.94 $0.00 $15.94 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $16.18 $6.90 $23.08 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $16.42 $6.40 $22.82 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $16.78 $6.90 $23.68 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: BOOM TRUCK $19.13 $1.11 $20.24 -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: BOOM TRUCK $20.08 $3.75 $23.83 -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.75 $6.40 $27.15 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.72 $6.72 $27.44 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.89 $6.40 $27.29 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.31 $6.40 $26.71 Above median -4% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $14.39 $0.00 $14.39 Above median -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.00 $6.40 $24.40 Above median -12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Douglas, NE — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Douglas

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260028-16005-hwy →