Residential Construction — Dawson, Nebraska

WD NE20260016-15929-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Dawson, Nebraska (construction type: residential) is $10.98/hr base + $0.00/hr fringe = $10.98/hr total package (WD NE20260016-15929-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: NE20260016-15929-res
Revision: 1
Construction Type: residential
State: Nebraska (NE)
County: Dawson
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference NE20260016View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $10.98 $0.00 $10.98 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.49 $0.00 $7.49 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.00 $7.25 Bottom 10% -69% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $8.50 $0.00 $8.50 -44% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR $7.25 $0.00 $7.25 Above median -66% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER $7.25 $0.00 $7.25 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $7.55 $0.00 $7.55 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $8.00 $0.00 $8.00 Above median -71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.60 $0.00 $7.60 -72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $8.40 $0.00 $8.40 -69% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.66 $0.00 $7.66 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dawson, NE — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dawson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NE20260016-15929-res →