Residential Construction — Treasure, Montana

WD MT20260006-17814-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Treasure, Montana (construction type: residential) is $13.45/hr base + $0.55/hr fringe = $14.00/hr total package (WD MT20260006-17814-res, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: MT20260006-17814-res
Revision: 1
Construction Type: residential
State: Montana (MT)
County: Treasure
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference MT20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.45 $0.55 $14.00 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $10.38 $1.57 $11.95 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $12.77 $1.70 $14.47 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER $8.70 $1.20 $9.90 -58% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS $9.86 $0.76 $10.62 -55% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: (PERFA-TAPER) $9.96 $0.76 $10.72 -54% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $12.70 $2.00 $14.70 -61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/LOADER 1 CU YD & UNDER $11.46 $1.57 $13.03 -55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $11.27 $1.57 $12.84 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $10.54 $0.25 $10.79 -54% vs market $0.00 $0.00 $0.00 $0.00
SIMILAR DUMP WAGON $10.09 $1.52 $11.61 $0.00 $0.00 $0.00 $0.00
SIMILAR DUMP WAGON $10.22 $1.52 $11.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS $10.24 $1.52 $11.76 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Treasure, MT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Treasure

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260006-17814-res →