Residential Construction — Stillwater, Montana

WD MT20260017-17824-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Stillwater, Montana (construction type: residential) is $10.50/hr base + $0.00/hr fringe = $10.50/hr total package (WD MT20260017-17824-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: MT20260017-17824-res
Revision: 1
Construction Type: residential
State: Montana (MT)
County: Stillwater
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference MT20260017View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $10.50 $0.00 $10.50 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $8.06 $1.22 $9.28 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $9.05 $0.94 $9.99 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $10.11 $1.60 $11.71 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.93 $8.18 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $8.44 $0.48 $8.92 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $9.44 $0.48 $9.92 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $8.95 $0.75 $9.70 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.65 $1.25 $11.90 -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $9.17 $1.30 $10.47 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER $9.36 $1.30 $10.66 Top 10% -63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER $9.07 $1.30 $10.37 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR WITHOUT ATTACHMENTS $9.36 $1.30 $10.66 -63% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.65 $0.47 $8.12 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $8.91 $0.91 $9.82 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS, FLAT TRUCK $8.11 $1.10 $9.21 -68% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: FLAT TRUCK $8.36 $1.10 $9.46 -67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: PICKUP HAULING MATERIALS $8.11 $1.10 $9.21 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Stillwater, MT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Stillwater

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260017-17824-res →