Davis-Bacon Wage Determinations — Silver Bow, Montana
Silver Bow has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.
Quick Answer
Davis-Bacon prevailing wage determinations for Silver Bow, Montana cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.
building
Active
WD: MT20260052-17834-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy
Active
WD: MT20260075-17834-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway
Active
WD: MT20260080-17834-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential
Active
WD: MT20260009-17834-res Rev. 1
Effective: May 17, 2026
View trade rates →
Top-Paying Trades in Silver Bow
Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.
| # | Trade | Construction Type | Base $/hr | Fringe $/hr | Total Package | |
|---|---|---|---|---|---|---|
| 1 | DIVER Diving | highway | $92.66 | $18.38 | $111.04 | WD → |
| 2 | DIVER: Diving | highway | $92.66 | $18.38 | $111.04 | WD → |
| 3 | YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME | building | $67.61 | $38.44 | $106.05 | WD → |
| 4 | BOILERMAKER | building | $38.75 | $32.31 | $71.06 | WD → |
| 5 | LINE CONSTRUCTION: Lineman | highway | $50.11 | $19.88 | $69.99 | WD → |
| 6 | LINE CONSTRUCTION Lineman | highway | $50.11 | $19.88 | $69.99 | WD → |
| 7 | PIPEFITTER, Excludes HVAC Pipe Installation | building | $46.45 | $19.92 | $66.37 | WD → |
| 8 | PLUMBER, Includes HVAC Pipe Installation | building | $46.45 | $19.92 | $66.37 | WD → |
| 9 | PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | building | $46.45 | $19.92 | $66.37 | WD → |
| 10 | PLUMBER, INCLUDES HVAC PIPE INSTALLATION | building | $46.45 | $19.92 | $66.37 | WD → |
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →