Heavy Construction — Ravalli, Montana

WD MT20260078-17837-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Ravalli, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260078-17837-hvy, Rev. 2).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MT20260078-17837-hvy
Revision: 2
Construction Type: heavy
State: Montana (MT)
County: Ravalli
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MT20260078View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 Above median $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.94 $10.40 $34.34 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $24.30 $7.80 $32.10 +15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $21.13 $7.00 $28.13 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 +77% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $32.08 $29.06 $61.14 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.14 $1.30 $16.44 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $21.81 $4.83 $26.64 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $21.44 $8.05 $29.49 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.99 $8.55 $30.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $22.94 $9.05 $31.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.69 $8.40 $33.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $24.20 $7.84 $32.04 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P $23.47 $10.40 $33.87 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $24.34 $10.40 $34.74 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.84 $5.92 $24.76 Above median -13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Ravalli, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Ravalli

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260078-17837-hvy →