Heavy Construction — Petroleum, Montana

WD MT20260077-17822-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Petroleum, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260077-17822-hvy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: MT20260077-17822-hvy
Revision: 1
Construction Type: heavy
State: Montana (MT)
County: Petroleum
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference MT20260077View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $24.30 $7.80 $32.10 +15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $21.13 $7.00 $28.13 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.51 $17.09 $55.60 +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.92 $18.17 $62.09 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.94 $16.97 $58.91 +78% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $32.08 $29.06 $61.14 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.14 $1.30 $16.44 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.13 $5.90 $24.03 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $29.09 $8.36 $37.45 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $48.65 $9.40 $58.05 Bottom 10% +12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $25.71 $8.05 $33.76 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.53 $8.05 $31.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.44 $8.45 $33.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.01 $7.78 $32.79 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P $23.47 $10.40 $33.87 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE OILER, BULLDOZER, ROLLER, EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL $23.94 $10.40 $34.34 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $24.34 $10.40 $34.74 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER DUMP TRUCK ZONE A ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FRO $45.28 $13.40 $58.68 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Petroleum, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Petroleum

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260077-17822-hvy →