Building Construction — Lincoln, Montana

WD MT20260041-17759-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Lincoln, Montana (construction type: building) is $42.00/hr base + $16.20/hr fringe = $58.20/hr total package (WD MT20260041-17759-bld, Rev. 2).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: MT20260041-17759-bld
Revision: 2
Construction Type: building
State: Montana (MT)
County: Lincoln
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference MT20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.00 $16.20 $58.20 Above median $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $38.00 $16.20 $54.20 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $21.51 $16.20 $37.71 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $16.69 $49.80 +59% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.76 $0.00 $18.76 -33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER:. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FR $32.05 $15.02 $47.07 +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.27 $1.50 $19.77 -26% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 +77% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF TH $67.61 $38.44 $106.05 Top 10% +161% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $32.08 $29.06 $61.14 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.10 $3.00 $20.10 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $19.10 $0.43 $19.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.44 $8.05 $29.49 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $19.18 $0.00 $19.18 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $39.38 $16.23 $55.61 +48% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $36.13 $15.98 $52.11 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC $40.00 $16.20 $56.20 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $20.20 $0.00 $20.20 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.00 $22.07 $62.07 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.88 $4.66 $23.54 Above median -17% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, MT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.