Building Construction — Flathead, Montana

WD MT20260032-17836-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 in Flathead, Montana (construction type: building) is $32.05/hr base + $15.02/hr fringe = $47.07/hr total package (WD MT20260032-17836-bld, Rev. 2).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: MT20260032-17836-bld
Revision: 2
Construction Type: building
State: Montana (MT)
County: Flathead
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference MT20260032View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 $32.05 $15.02 $47.07 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.00 $16.20 $58.20 Above median $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $38.00 $16.20 $54.20 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $21.51 $16.20 $37.71 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $16.69 $49.80 +59% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 18.53 0.00 CARPENTER $16.87 $0.00 $16.87 -40% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 +77% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, Excludes Low Voltage Wiring for Alarms.$ 28.95 4.37 CEMENT MASON/CONCRETE FINISHER $18.27 $1.50 $19.77 -40% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF TH $67.61 $38.44 $106.05 Top 10% +161% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $32.08 $29.06 $61.14 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.29 $0.00 $14.29 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $20.39 $4.38 $24.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.44 $8.05 $29.49 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $19.18 $0.00 $19.18 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $39.38 $16.23 $55.61 +48% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $36.13 $15.98 $52.11 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC $40.00 $16.20 $56.20 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $20.20 $0.00 $20.20 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.00 $22.07 $62.07 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.88 $4.66 $23.54 Above median -17% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Flathead, MT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Flathead

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260032-17836-bld →