Residential Construction — Deer Lodge, Montana

WD MT20260021-17830-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Deer Lodge, Montana (construction type: residential) is $14.15/hr base + $0.55/hr fringe = $14.70/hr total package (WD MT20260021-17830-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: MT20260021-17830-res
Revision: 1
Construction Type: residential
State: Montana (MT)
County: Deer Lodge
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference MT20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $14.15 $0.55 $14.70 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $13.42 $3.31 $16.73 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.00 $3.00 $18.00 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.75 $1.67 $17.42 -47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $14.41 $2.80 $17.21 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HOD CARRIER $10.66 $1.75 $12.41 Top 10% -48% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYER $10.36 $1.75 $12.11 Above median -49% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: UNSKILLED $10.16 $1.75 $11.91 Above median -50% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $8.65 $0.00 $8.65 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $10.50 $1.10 $11.60 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.45 $1.95 $18.40 -51% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.99 $2.05 $17.04 -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: COMBINATION TRUCK, CONCRETE MIXER, TRANSIT MIXER $11.10 $1.66 $12.76 -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: FLATBED $11.20 $1.66 $12.86 Top 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: PICKUP $10.95 $1.66 $12.61 Above median -56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Deer Lodge, MT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Deer Lodge

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260021-17830-res →