Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Carbon, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260065-17737-hvy, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MT20260065-17737-hvy
Revision: 1
Construction Type: heavy
State: Montana (MT)
County: Carbon
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MT20260065View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.47 $10.40 $33.87 Bottom 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FRO $36.49 $14.33 $50.82 +82% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.92 $18.17 $62.09 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: COMMON OR GENERAL ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE $25.55 $13.44 $38.99 +65% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT ROLLER $22.39 $3.96 $26.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.67 $8.05 $33.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $26.54 $8.05 $34.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.31 $8.05 $34.36 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $25.00 $0.00 $25.00 +6% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.21 $21.01 $62.22 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $40.07 $16.20 $56.27 +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 75 TO 144 TONS, WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICAB $41.15 $16.20 $57.35 +98% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJ $23.94 $10.40 $34.34 +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $24.34 $10.40 $34.74 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER WATER TRUCK ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE $32.88 $13.98 $46.86 +65% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.98 $4.90 $24.88 Above median -12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Carbon, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Carbon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260065-17737-hvy →