Heavy Construction — Carbon, Montana
WD MT20260065-17737-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Carbon, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260065-17737-hvy, Rev. 1).
Scroll down for all 20 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $42.23 | $16.20 | $58.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $23.47 | $10.40 | $33.87 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $38.75 | $32.31 | $71.06 +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FRO | $36.49 | $14.33 | $50.82 +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.92 | $18.17 | $62.09 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.83 | $25.30 | $62.13 Above median +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ZONE 1: COMMON OR GENERAL ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $25.55 | $13.44 | $38.99 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT ROLLER | $22.39 | $3.96 | $26.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.67 | $8.05 | $33.72 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $26.54 | $8.05 | $34.59 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $26.31 | $8.05 | $34.36 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND SPRAY | $25.00 | $0.00 | $25.00 +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.21 | $21.01 | $62.22 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S | $38.98 | $16.20 | $55.18 Top 10% +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S | $40.07 | $16.20 | $56.27 +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 75 TO 144 TONS, WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICAB | $41.15 | $16.20 | $57.35 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJ | $23.94 | $10.40 | $34.34 +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S | $24.34 | $10.40 | $34.74 Top 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER WATER TRUCK ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE | $32.88 | $13.98 | $46.86 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $19.98 | $4.90 | $24.88 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Carbon, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Carbon
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Carbon, Montana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.