Residential Construction — Beaverhead, Montana

WD MT20260013-17828-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Beaverhead, Montana (construction type: residential) is $10.50/hr base + $0.00/hr fringe = $10.50/hr total package (WD MT20260013-17828-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MT20260013-17828-res
Revision: 1
Construction Type: residential
State: Montana (MT)
County: Beaverhead
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MT20260013View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $10.50 $0.00 $10.50 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.91 $2.22 $10.13 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.95 $0.75 $9.70 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $9.90 $1.00 $10.90 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $10.11 $1.60 $11.71 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $1.68 $8.93 -62% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $7.60 $0.35 $7.95 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $10.40 $0.35 $10.75 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $8.95 $0.75 $9.70 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.65 $1.25 $11.90 -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $9.17 $1.30 $10.47 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER $9.36 $1.30 $10.66 Top 10% -63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER $9.07 $1.30 $10.37 Bottom 10% -64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR W/O ATTACHMENTS $9.36 $1.30 $10.66 -63% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.63 $1.65 $9.28 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $9.15 $1.79 $10.94 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: FLAT TRUCK $8.11 $1.10 $9.21 -68% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: FLAT TRUCK $8.36 $1.10 $9.46 -67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: PICKUP $8.11 $1.10 $9.21 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Beaverhead, MT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Beaverhead

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260013-17828-res →