Building Construction — Webster, Missouri

WD MO20260086-15914-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Webster, Missouri (construction type: building) is $41.15/hr base + $23.90/hr fringe = $65.05/hr total package (WD MO20260086-15914-bld, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: MO20260086-15914-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Webster
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference MO20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $41.15 $23.90 $65.05 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $29.50 $21.50 $51.00 +73% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.40 $18.32 $49.72 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.25 $20.81 $53.06 +56% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $42.97 $29.84 $72.81 $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.00 $34.25 $73.25 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.49 $10.76 $31.25 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $34.05 $15.73 $49.78 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $31.80 $14.91 $46.71 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $40.82 $17.56 $58.38 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $47.29 $22.42 $69.71 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $39.61 $30.15 $69.76 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $20.78 $5.15 $25.93 +8% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $39.35 $15.72 $55.07 +84% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $43.46 $30.22 $73.68 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $43.46 $30.22 $73.68 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $45.96 $30.57 $76.53 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $43.46 $30.22 $73.68 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.48 $13.19 $42.67 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.43 $17.86 $52.29 +64% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.09 $20.36 $54.45 Above median +87% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Webster, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Webster

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260086-15914-bld →