Residential Construction — Warren, Missouri

WD MO20260070-15864-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Warren, Missouri (construction type: residential) is $41.15/hr base + $23.90/hr fringe = $65.05/hr total package (WD MO20260070-15864-res, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MO20260070-15864-res
Revision: 1
Construction Type: residential
State: Missouri (MO)
County: Warren
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MO20260070View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $41.15 $23.90 $65.05 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING $36.90 $21.55 $58.45 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING $32.38 $21.55 $53.93 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.00 $0.00 $16.00 -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.36 $11.53 $55.89 +64% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.23 $9.91 $28.14 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $31.57 $15.85 $47.42 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.84 $14.86 $40.70 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL LINCOLN AND WARREN COUNTIES $33.57 $14.85 $48.42 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL ST.CHARLES COUNTY $34.07 $14.85 $48.92 +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABOR $30.37 $15.91 $46.28 +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL LABORER $30.37 $15.91 $46.28 Bottom 10% +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $25.84 $14.86 $40.70 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK LINCOLN AND WARREN COUNTIES $40.26 $16.05 $56.31 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK ST. CHARLES COUNTY $40.26 $16.05 $56.31 +117% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $38.60 $17.66 $56.26 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $33.90 $17.21 $51.11 Bottom 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL FINISHING/TAPING $34.90 $17.21 $52.11 +116% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR $34.61 $29.50 $64.11 Bottom 10% +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR $41.01 $29.63 $70.64 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: ROLLER $34.61 $29.50 $64.11 Bottom 10% +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:: ROLLER $41.01 $29.63 $70.64 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.00 $27.12 $79.12 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $52.32 $28.96 $81.28 Above median +172% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $42.93 $27.52 $70.45 Above median +136% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Warren, MO — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Warren

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260070-15864-res →