Building Construction — Pulaski, Missouri

WD MO20260019-15902-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Pulaski, Missouri (construction type: building) is $31.97/hr base + $14.00/hr fringe = $45.97/hr total package (WD MO20260019-15902-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: MO20260019-15902-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Pulaski
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference MO20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 +92% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $23.65 $7.92 $31.57 -7% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.19 $21.85 $66.04 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $40.08 $21.85 $61.93 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $36.63 $9.85 $46.48 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.70 $19.84 $59.54 +75% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.87 $1.47 $31.34 +34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.90 $8.88 $29.78 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $41.67 $31.25 $72.92 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.33 $15.30 $45.63 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER $32.23 $15.30 $47.53 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $24.90 $0.00 $24.90 -4% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $33.90 $17.21 $51.11 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $33.90 $17.21 $51.11 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $35.76 $30.38 $66.14 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.00 $27.12 $79.12 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $23.65 $4.50 $28.15 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.53 $73.47 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57 Above median +5% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pulaski, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pulaski

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260019-15902-bld →