Residential Construction — Phelps, Missouri

WD MO20260061-15900-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Phelps, Missouri (construction type: residential) is $32.79/hr base + $21.31/hr fringe = $54.10/hr total package (WD MO20260061-15900-res, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: MO20260061-15900-res
Revision: 1
Construction Type: residential
State: Missouri (MO)
County: Phelps
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference MO20260061View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $32.79 $21.31 $54.10 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.16 $2.77 $19.93 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.53 $0.00 $15.53 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.15 $5.69 $22.84 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, DRYWALL FINISHING/TAPING, AND ROLLER $28.56 $17.21 $45.77 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: BRUSH AND ROLLER $33.90 $17.21 $51.11 Bottom 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS:: DRYWALL FINISHING/TAPING $34.90 $17.21 $52.11 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM $27.37 $8.14 $35.51 Bottom 10% +11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM $52.00 $27.12 $79.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Phelps, MO — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Phelps

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260061-15900-res →