Building Construction — Montgomery, Missouri

WD MO20260033-15853-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Montgomery, Missouri (construction type: building) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD MO20260033-15853-bld, Rev. 1).

Scroll down for all 50 trade classifications covered by this determination.

WD Number: MO20260033-15853-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Montgomery
Effective: May 17, 2026
Trades covered: 50
Official source: SAM.gov reference MO20260033View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 Above median +196% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 +92% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $27.66 $5.88 $33.54 -1% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING & FORM WORK $39.53 $21.85 $61.38 Bottom 10% +109% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING & FORM WORK $41.30 $21.85 $63.15 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING & FORM WORK $44.19 $21.85 $66.04 +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION $31.51 $22.25 $53.76 +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: RESILIENT & VINYL FLOORING ONLY $40.08 $21.85 $61.93 +111% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.52 $15.88 $49.40 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $36.63 $9.85 $46.48 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 +75% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.87 $1.47 $31.34 +34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.02 $9.49 $30.51 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.00 $34.25 $70.25 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $41.67 $31.25 $72.92 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $24.90 $0.00 $24.90 -4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $28.95 $14.95 $43.90 +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $32.23 $15.91 $48.14 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.71 $15.50 $45.21 +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $26.95 $14.95 $41.90 +62% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $30.33 $15.91 $46.24 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $27.71 $15.50 $43.21 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, LANDSCAPE & BRICK MASON TENDER $41.18 $15.96 $57.14 +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $33.90 $17.21 $51.11 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, & DRYWALL FINISHING/TAPING ONLY $28.56 $17.21 $45.77 +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.39 $17.76 $43.15 +79% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $34.90 $17.21 $52.11 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 Top 10% +188% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $30.13 $78.79 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $29.38 $79.98 Bottom 10% +168% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $30.13 $78.79 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $29.38 $79.98 Bottom 10% +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $35.76 $30.38 $66.14 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.25 $17.46 $49.71 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.53 $73.47 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57 Above median +5% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260033-15853-bld →