Building Construction — Marion, Missouri
WD MO20260031-15851-bld · Revision 3 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Marion, Missouri (construction type: building) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD MO20260031-15851-bld, Rev. 3).
Scroll down for all 63 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 Above median +196% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 Above median +239% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 | $58.80 Above median +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $32.37 | $20.17 | $52.54 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 Above median +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.15 | $23.90 | $65.05 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $42.06 | $22.40 | $64.46 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $39.48 | $22.40 | $61.88 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $35.49 | $21.85 | $57.34 Above median +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $31.51 | $22.25 | $53.76 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $39.59 | $22.40 | $61.99 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER | $41.71 | $21.85 | $63.56 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION | $36.99 | $21.85 | $58.84 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 -4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $54.01 | $27.85 | $81.86 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $37.60 | $22.14 | $59.74 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.20 | $21.50 | $64.70 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $26.44 | $0.00 | $26.44 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $14.19 | $5.19 | $19.38 Bottom 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 Above median +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $36.30 | $25.80 | $62.10 Above median +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $29.65 | $16.95 | $46.60 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $30.01 | $15.75 | $45.76 +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $32.51 | $15.75 | $48.26 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $30.78 | $16.05 | $46.83 Above median +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $29.25 | $16.95 | $46.20 Above median +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $29.81 | $15.75 | $45.56 Above median +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $32.31 | $15.75 | $48.06 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $28.78 | $16.05 | $44.83 +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $39.40 | $17.66 | $57.06 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $24.43 | $17.76 | $42.19 Bottom 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $28.56 | $17.21 | $45.77 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $36.10 | $19.97 | $56.07 Above median +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 +12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 | $85.86 Top 10% +188% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER | $48.66 | $22.79 | $71.45 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION | $50.60 | $30.13 | $80.73 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 Top 10% +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $49.45 | $26.65 | $76.10 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER | $48.66 | $22.79 | $71.45 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION | $50.60 | $30.13 | $80.73 Top 10% +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $45.48 | $22.42 | $67.90 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $45.48 | $22.42 | $67.90 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $40.00 | $22.05 | $62.05 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.45 | $22.29 | $60.74 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $34.50 | $18.96 | $53.46 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.60 | $19.99 | $53.59 Above median +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 | $73.48 Above median +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $36.51 | $22.39 | $58.90 Above median +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $40.53 | $15.99 | $56.52 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.79 | $21.31 | $54.10 Above median +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 Above median +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Marion, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Marion
Compliance Notes
- This wage determination applies to federal contracts for building construction in Marion, Missouri.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.