Building Construction — Marion, Missouri

WD MO20260031-15851-bld · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Marion, Missouri (construction type: building) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD MO20260031-15851-bld, Rev. 3).

Scroll down for all 63 trade classifications covered by this determination.

WD Number: MO20260031-15851-bld
Revision: 3
Construction Type: building
State: Missouri (MO)
County: Marion
Effective: May 17, 2026
Trades covered: 63
Official source: SAM.gov reference MO20260031View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 Above median +196% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 Above median +239% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.26 $20.54 $58.80 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.37 $20.17 $52.54 +120% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.06 $24.35 $60.41 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.15 $23.90 $65.05 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $42.06 $22.40 $64.46 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $39.48 $22.40 $61.88 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $35.49 $21.85 $57.34 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $31.51 $22.25 $53.76 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $39.59 $22.40 $61.99 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER $41.71 $21.85 $63.56 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION $36.99 $21.85 $58.84 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 -4% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 +75% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.20 $21.50 $64.70 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 Bottom 10% -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 Above median +143% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $41.67 $31.25 $72.92 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.30 $25.80 $62.10 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.65 $16.95 $46.60 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $30.01 $15.75 $45.76 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $32.51 $15.75 $48.26 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $30.78 $16.05 $46.83 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $29.25 $16.95 $46.20 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $29.81 $15.75 $45.56 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $32.31 $15.75 $48.06 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $28.78 $16.05 $44.83 +73% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $39.40 $17.66 $57.06 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $28.56 $17.21 $45.77 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $36.10 $19.97 $56.07 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 Top 10% +188% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $22.79 $71.45 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $30.13 $80.73 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $49.45 $26.65 $76.10 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $22.79 $71.45 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $30.13 $80.73 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.50 $18.96 $53.46 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $15.99 $56.52 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 Above median +19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Marion, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Marion

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260031-15851-bld →