Residential Construction — Howard, Missouri

WD MO20260067-15720-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Howard, Missouri (construction type: residential) is $32.79/hr base + $21.31/hr fringe = $54.10/hr total package (WD MO20260067-15720-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: MO20260067-15720-res
Revision: 1
Construction Type: residential
State: Missouri (MO)
County: Howard
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference MO20260067View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $32.79 $21.31 $54.10 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.33 $1.32 $19.65 -33% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.00 $0.00 $16.00 -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.23 $9.91 $28.14 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER $23.94 $15.80 $39.74 +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $23.94 $15.80 $39.74 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $28.56 $17.21 $45.77 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $50.60 $29.38 $79.98 Above median +168% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR $45.48 $22.42 $67.90 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR $34.61 $29.50 $64.11 Bottom 10% +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $34.61 $29.50 $64.11 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM $27.37 $8.14 $35.51 Bottom 10% +11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM $36.51 $22.39 $58.90 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Howard, MO — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Howard

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260067-15720-res →