Residential Construction — Greene, Missouri

WD MO20260069-15881-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Greene, Missouri (construction type: residential) is $33.67/hr base + $19.48/hr fringe = $53.15/hr total package (WD MO20260069-15881-res, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: MO20260069-15881-res
Revision: 1
Construction Type: residential
State: Missouri (MO)
County: Greene
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference MO20260069View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $33.67 $19.48 $53.15 +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $23.58 $20.20 $43.78 +49% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.00 $0.00 $16.00 -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.40 $19.11 $51.51 +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER $23.32 $11.56 $34.88 +35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.77 $11.56 $34.33 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $19.75 $11.76 $31.51 +31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.35 $15.72 $55.07 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR $45.48 $22.42 $67.90 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $14.51 $45.24 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.43 $17.86 $52.29 +64% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Greene, MO — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Greene

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260069-15881-res →