Building Construction — De Kalb, Missouri

WD MO20260081-15714-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in De Kalb, Missouri (construction type: building) is $40.53/hr base + $16.69/hr fringe = $57.22/hr total package (WD MO20260081-15714-bld, Rev. 2).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: MO20260081-15714-bld
Revision: 2
Construction Type: building
State: Missouri (MO)
County: De Kalb
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference MO20260081View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $40.53 $16.69 $57.22 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.63 $22.40 $67.03 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.13 $20.50 $60.63 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.20 $21.50 $64.70 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $43.60 $33.52 $77.12 $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.00 $34.25 $73.25 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.31 $15.75 $48.06 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $34.05 $15.73 $49.78 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $31.80 $14.91 $46.71 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $40.82 $17.56 $58.38 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.48 $22.42 $67.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $45.48 $22.42 $67.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $47.29 $22.42 $69.71 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $44.14 $22.42 $66.56 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $38.39 $17.55 $55.94 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $39.61 $30.15 $69.76 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $24.14 $9.67 $33.81 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $57.51 $28.35 $85.86 Above median +188% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $58.38 $25.29 $83.67 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $45.96 $30.57 $76.53 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $47.20 $26.28 $73.48 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.09 $20.36 $54.45 Above median +87% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the De Kalb, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in De Kalb

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260081-15714-bld →