Building Construction — Crawford, Missouri

WD MO20260056-15769-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Crawford, Missouri (construction type: building) is $46.00/hr base + $36.25/hr fringe = $82.25/hr total package (WD MO20260056-15769-bld, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: MO20260056-15769-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Crawford
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference MO20260056View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $46.00 $36.25 $82.25 Above median +174% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.15 $23.90 $65.05 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.19 $21.85 $66.04 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $40.08 $21.85 $61.93 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $36.63 $9.85 $46.48 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $40.00 $24.25 $64.25 Above median +175% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK & CEMENT/CONCRETE MASON TENDER $32.23 $15.30 $47.53 +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; ASPHALT SHOVELER; PIPELAYER $30.33 $15.30 $45.63 +76% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: HOIST $26.02 $13.01 $39.03 $0.00 $0.00 $0.00 $0.00
PAINTER $34.90 $17.21 $52.11 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $33.90 $17.21 $51.11 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $17.78 $0.00 $17.78 -26% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.60 $30.13 $80.73 Above median +170% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $48.66 $22.79 $71.45 +139% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.60 $30.13 $80.73 Above median +170% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $48.66 $22.79 $71.45 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FORKLIFT $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER/BLADE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: PAVER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.52 $73.46 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.50 $18.15 $46.65 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.09 $19.91 $54.00 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M $62.73 $38.44 $101.17 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Crawford, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Crawford

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260056-15769-bld →