Building Construction — Crawford, Missouri
WD MO20260056-15769-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BOILERMAKER in Crawford, Missouri (construction type: building) is $46.00/hr base + $36.25/hr fringe = $82.25/hr total package (WD MO20260056-15769-bld, Rev. 1).
Scroll down for all 31 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $46.00 | $36.25 | $82.25 Above median +174% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.15 | $23.90 | $65.05 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $44.19 | $21.85 | $66.04 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $40.08 | $21.85 | $61.93 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $40.00 | $24.25 | $64.25 Above median +175% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK & CEMENT/CONCRETE MASON TENDER | $32.23 | $15.30 | $47.53 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL; ASPHALT SHOVELER; PIPELAYER | $30.33 | $15.30 | $45.63 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: HOIST | $26.02 | $13.01 | $39.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $34.90 | $17.21 | $52.11 Above median +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $33.90 | $17.21 | $51.11 Above median +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $17.78 | $0.00 | $17.78 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $50.60 | $30.13 | $80.73 Above median +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $48.66 | $22.79 | $71.45 +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $50.60 | $30.13 | $80.73 Above median +170% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $48.66 | $22.79 | $71.45 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: CRANE | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: LOADER | $39.06 | $30.38 | $69.44 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: PAVER | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: ROLLER | $39.06 | $30.38 | $69.44 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $40.00 | $22.05 | $62.05 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.94 | $27.52 | $73.46 Above median +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.50 | $18.15 | $46.65 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $34.09 | $19.91 | $54.00 Above median +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M | $62.73 | $38.44 | $101.17 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Crawford, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Crawford
Compliance Notes
- This wage determination applies to federal contracts for building construction in Crawford, Missouri.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.