Building Construction — Cooper, Missouri

WD MO20260010-15712-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Cooper, Missouri (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD MO20260010-15712-bld, Rev. 2).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MO20260010-15712-bld
Revision: 2
Construction Type: building
State: Missouri (MO)
County: Cooper
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MO20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 Above median +239% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $27.66 $5.88 $33.54 -1% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.51 $22.25 $53.76 +83% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.52 $15.88 $49.40 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $29.87 $1.47 $31.34 +34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.02 $9.49 $30.51 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.00 $34.25 $70.25 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.78 $16.05 $44.83 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.78 $16.05 $46.83 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $24.90 $0.00 $24.90 -4% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $25.39 $17.76 $43.15 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $24.43 $17.76 $42.19 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.53 $73.47 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57 Above median +5% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cooper, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cooper

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260010-15712-bld →