Building Construction — Cedar, Missouri

WD MO20260008-15874-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Cedar, Missouri (construction type: building) is $31.97/hr base + $14.00/hr fringe = $45.97/hr total package (WD MO20260008-15874-bld, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MO20260008-15874-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Cedar
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MO20260008View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 +92% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $30.75 $0.50 $31.25 -8% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $29.50 $21.50 $51.00 +73% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.25 $20.81 $53.06 +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.72 $8.93 $29.65 -13% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $22.71 $0.00 $22.71 -3% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.50 $13.18 $39.68 +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.00 $13.18 $41.18 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.44 $0.00 $20.44 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $23.55 $7.47 $31.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.47 $0.00 $24.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.79 $15.35 $41.14 +71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $39.35 $15.72 $55.07 +84% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $39.35 $15.72 $55.07 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $14.51 $45.24 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $34.43 $17.86 $52.29 +64% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $26.47 $14.89 $41.36 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS $60.69 $38.44 $99.13 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cedar, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.