Building Construction — Carroll, Missouri

WD MO20260007-15707-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Carroll, Missouri (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD MO20260007-15707-bld, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: MO20260007-15707-bld
Revision: 2
Construction Type: building
State: Missouri (MO)
County: Carroll
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference MO20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 Above median +239% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $39.85 $21.70 $61.55 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $31.53 $0.00 $31.53 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 -4% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 Bottom 10% -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $39.00 $34.25 $73.25 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.35 $18.05 $46.40 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.75 $18.05 $46.80 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $24.43 $17.76 $42.19 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 Top 10% +188% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $50.43 $26.96 $77.39 Above median +143% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $15.99 $56.52 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 Above median +19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Carroll, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Carroll

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260007-15707-bld →