Building Construction — Butler, Missouri

WD MO20260004-15870-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Butler, Missouri (construction type: building) is $34.69/hr base + $22.84/hr fringe = $57.53/hr total package (WD MO20260004-15870-bld, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MO20260004-15870-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Butler
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MO20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $34.69 $22.84 $57.53 +141% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.51 $15.00 $46.51 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $32.59 $21.85 $54.44 +85% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $40.08 $21.85 $61.93 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.10 $18.78 $53.88 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.29 $33.64 $82.93 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $34.47 $24.85 $59.32 +105% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.48 $14.91 $45.39 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.75 $0.00 $22.75 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $22.80 $10.78 $33.58 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $16.44 $6.01 $22.45 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.44 $6.01 $22.45 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.25 $17.46 $49.71 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.53 $73.47 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.51 $15.00 $46.51 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M $62.73 $38.44 $101.17 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Butler, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Butler

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260004-15870-bld →