Building Construction — Benton, Missouri

WD MO20260029-15868-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Benton, Missouri (construction type: building) is $31.97/hr base + $14.00/hr fringe = $45.97/hr total package (WD MO20260029-15868-bld, Rev. 1).

Scroll down for all 44 trade classifications covered by this determination.

WD Number: MO20260029-15868-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Benton
Effective: May 17, 2026
Trades covered: 44
Official source: SAM.gov reference MO20260029View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 +92% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.67 $19.48 $53.15 +57% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $31.51 $22.25 $53.76 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $29.50 $21.50 $51.00 +73% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $32.25 $20.81 $53.06 Bottom 10% +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS $51.01 $26.25 $77.26 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $22.71 $0.00 $22.71 -3% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 Above median +143% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $28.00 $13.18 $41.18 +59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.78 $13.62 $43.40 +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $26.50 $13.18 $39.68 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $27.05 $13.62 $40.67 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $23.55 $7.47 $31.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.47 $0.00 $24.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $25.79 $15.35 $41.14 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.39 $17.76 $43.15 +79% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 Top 10% +188% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY $37.15 $15.42 $52.57 +76% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $35.75 $15.32 $51.07 +71% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $32.78 $15.32 $48.10 +61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY $37.15 $15.42 $52.57 +76% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $34.25 $15.32 $49.57 +66% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY $31.28 $15.32 $46.60 +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $31.62 $18.07 $49.69 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.73 $14.51 $45.24 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $47.20 $26.28 $73.48 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $34.43 $17.86 $52.29 +64% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $26.47 $14.89 $41.36 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS $60.69 $38.44 $99.13 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Benton, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Benton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260029-15868-bld →