Building Construction — Audrain, Missouri

WD MO20260002-15764-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Audrain, Missouri (construction type: building) is $43.48/hr base + $27.24/hr fringe = $70.72/hr total package (WD MO20260002-15764-bld, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MO20260002-15764-bld
Revision: 1
Construction Type: building
State: Missouri (MO)
County: Audrain
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MO20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 Above median +196% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER $41.30 $21.85 $63.15 Bottom 10% +115% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION $39.53 $21.85 $61.38 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 -4% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 +75% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 Bottom 10% -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $41.67 $31.25 $72.92 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.78 $16.05 $44.83 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.78 $16.05 $46.83 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $28.56 $17.21 $45.77 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 +12% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 Above median +176% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $39.06 $30.38 $69.44 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 Above median +19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Audrain, MO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Audrain

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MO20260002-15764-bld →