Building Construction — Wilkinson, Mississippi

WD MS20260043-15672-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Wilkinson, Mississippi (construction type: building) is $16.10/hr base + $0.00/hr fringe = $16.10/hr total package (WD MS20260043-15672-bld, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: MS20260043-15672-bld
Revision: 1
Construction Type: building
State: Mississippi (MS)
County: Wilkinson
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference MS20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $16.10 $0.00 $16.10 -27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.00 $20.00 -6% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.35 $11.39 $41.74 +52% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $24.05 $12.29 $36.34 +92% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.76 $1.19 $11.95 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.98 $0.00 $12.98 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.52 $0.75 $13.27 -26% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.00 $1.32 $19.32 $0.00 $0.00 $0.00 $0.00
PAINTER $15.17 $0.00 $15.17 -23% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $22.77 $6.96 $29.73 +7% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.67 0.68 PLUMBER $19.82 $4.32 $24.14 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.50 $1.15 $14.65 -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Wilkinson, MS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Wilkinson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260043-15672-bld →