Residential Construction — Smith, Mississippi

WD MS20260025-15669-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Smith, Mississippi (construction type: residential) is $18.30/hr base + $0.00/hr fringe = $18.30/hr total package (WD MS20260025-15669-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: MS20260025-15669-res
Revision: 1
Construction Type: residential
State: Mississippi (MS)
County: Smith
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference MS20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.30 $0.00 $18.30 -23% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $9.60 $0.00 $9.60 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.00 $0.00 $10.00 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $11.50 $0.00 $11.50 -45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS $15.04 $0.00 $15.04 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.39 $0.00 $7.39 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $8.03 $0.00 $8.03 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $8.31 $0.00 $8.31 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $13.63 $0.00 $13.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.13 $0.00 $13.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $10.00 $0.00 $10.00 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $11.42 $0.00 $11.42 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS $10.89 $0.00 $10.89 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $8.65 $0.00 $8.65 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Smith, MS — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Smith

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260025-15669-res →