Highway Construction — Rankin, Mississippi

WD MS20260140-15665-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Rankin, Mississippi (construction type: highway) is $15.47/hr base + $0.00/hr fringe = $15.47/hr total package (WD MS20260140-15665-hwy, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: MS20260140-15665-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Rankin
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference MS20260140View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.47 $0.00 $15.47 -30% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.02 $0.00 $14.02 -34% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.04 $5.87 $29.91 +9% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $12.04 $0.00 $12.04 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $12.07 $0.00 $12.07 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $11.92 $0.00 $11.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.47 $0.00 $15.47 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; AND GRADE CHECKING $10.65 $0.00 $10.65 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $10.22 $0.00 $10.22 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $11.29 $0.00 $11.29 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.27 $0.00 $11.27 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.44 $0.00 $13.44 -25% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.36 $0.00 $15.36 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.64 $0.00 $11.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $11.57 $0.00 $11.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.41 $0.00 $15.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $14.38 $0.00 $14.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.22 $0.00 $19.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $10.95 $0.00 $10.95 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.41 $0.00 $14.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRINDING/GROOVING MACHINE $15.90 $0.00 $15.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.57 $0.00 $12.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.27 $0.00 $19.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $14.68 $0.00 $14.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: MIXER $14.25 $0.00 $14.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.35 $0.00 $12.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $12.15 $0.00 $12.15 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.64 $0.00 $12.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.25 $0.00 $12.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $11.22 $0.00 $11.22 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION $30.35 $11.39 $41.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.56 $0.00 $12.56 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.06 $0.00 $14.06 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $11.00 $0.00 $11.00 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.60 $0.00 $14.60 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $10.98 $0.00 $10.98 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rankin, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Rankin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260140-15665-hwy →